There are several kinds of external wall painting. In addition to the frequently used external surfaces wall surface latex color and imitation natural stone paint, lots of people are also making use of external walls texture paint. How is it external wall structure painting manufactured?
1. Environmental protection: Include the building location to stop pollution.
2. Grassroots inspection and handling:
a. Check whether there are actually holes or hollows around the wall structure.
b. Thoroughly clean outdated walls.
c. Get rid of drifting airborne dirt and dust, grease as well as other accessories.
d. Use exterior walls putty to complete holes, hollows and depressions, and look after for 5 to 1 week.
3. Putty scraping:
a. Clean the adaptable progressing putty 1 to 2 instances in the dealt with foundation work surface.
b. For porcelain ceramic tiles and mosaic walls, initially use a complete coating of basic program agent, then utilize a complete batch of floor tile remodelling putty for progressing.
c. Polish the putty work surface until clean.
d. Following the putty construction is completed, it needs to be cured for 15 to 20 days and nights (23±2℃).
e. Clean the versatile shiny tape 2 to 3 times, with an interval of 12 hrs in between each complete (23±2℃), and free of moisture it for 24 hours (23±2℃) after conclusion.
4. Use primer:
a. Make use of a wool curler or apply firearm to evenly utilize the specific securing primer 1 to 2 occasions.
b. Once the primer is completely dried out (6 days and nights/23±2℃), the subsequent process could be completed.
5. Structure color preparing:
a. Make use of an electrical blender to totally mix the outside walls consistency paint to increase mature it.
6. Texture paint application:
a. Utilize a set table to use an appropriate level of feel paint evenly and vertically towards the wall structure, flatten and portable it horizontally to ensure that the fullness of your paint in the wall surface is steady.
b Work with an iron platter or a homemade cup dish to massage the fresh paint evenly within a round movement within the same route with modest power till the beach sand debris are evenly rubbed out.
c. Apply a full batch of fresh paint till the basic surface is entirely covered, and also retain the scraper with a 30-education perspective to be sure the proper fullness. Execute two goes by of flattening, the very first successfully pass vertically along with the second complete horizontally.
7. Servicing:
a. The complete video-forming and solidifying time period of the finish is 7 days (23±2℃).